How to discharge a powder tanker?

The selection of the size and position of the discharge port is the key to improving the bulk cement transport vehicle. Therefore, using the mobile discharge tube is able to effectively improve increase discharge speed and reduce residual rate.

50t cement tanker
50t cement tanker 7

How?to?operate?a?powder?tanker£¿

1.?Securely?connect?the?hot?air?hose?to?the?tanker?&?the?discharge?hose?to?the?silo.

2.?Open?the?boost?valve,?top?air?and?the?rear?aeration?valve?on?the?tanker?(open?2 aeration?valves?if?no?top?air?fitted)

3.?Close?air?dump?valve?and?discharge?valves.

4.?Engage?PTO?and?idle?blower/compressor,?blowing?air?into?the?silo.?This?ensures?the blower/compressor?is?not?started?under?load.

5.?Increase?truck?rpm?to?the?correct?speed?for?blower/compressor?operation.?Check blower/compressor;
?Unit?is?running?smoothly???Is oil pressure?gauge?reading?OK?
?No?mechanical?noises?? Is air filter?restriction?gauge?reading?OK? ?
?No?air?leaks???No?loose?parts?

6.?Close?the?boost?valve?to?pressurize?the?tanker?up?to?the?safe?working?pressure?for?the tanker?or?silo. Open?the?boost?valve,?then?quickly?open?the?rear?discharge?valve?to?begin discharging the product?into?the?silo.

8.?While?discharging,?monitor?the?tanker?pressure?ensuring?it?remains?below?the maximum. If?tanker?pressure?too?high,?open?boost?valve.
If?tanker?pressure?too?low,?close?boost?valve?slightly.

9.?When?the?tanker?pressure?drops?rapidly?close?the?discharge?valve.

10.?Open?the?aeration?valve?on?the?next?cone,?close?the?rear?aeration?and?boost?valves?to build?tanker?pressure.?(Repeat?steps?7?&?10?until?the?tanker?is?empty).

11.?When?discharge?into?silo?is?complete,?clean?any?remaining?product?out?of?each?cone.

12.?Drain?remaining?tanker?pressure;?either?into?the?silo?or?use?the?tanker?dump?valve.

13.?Open?boost?valve,?reduce?truck?rpm?to?idle,?blowing?air?into?the?silo?to?cool?the blower/compressor?down?then?dis-engage?PTO.?This?ensures the blower/compressor?is not?shut?down?under?load.

14.?Close?discharge?valves,?leave?boost?valve?&?tanker?air?dump?valve?open?ready?for next?load.?Disconnect?hot?air?hose?from the tanker?if?required.

Where can I take my tanker to get lime off the outside?

Before discharging, the lime tanker vehicle should be parked on a flat unloading site, Cement (lime) shall not be loaded or unloaded in the open on rainy days. Regular inspection and confirm that the inlet cover is tightly closed, and do not allow water or humid air to enter the tank.

How to pump fly ash from a tanker?

Do not load or unload cement (fly ash) in the open on rainy days. Regular check and confirm that the inlet cover is tightly closed, and do not allow water or humid air to enter the tank. Before fly ash tanker unloading, the tanker vehicle should be parked on a flat unloading site, the discharge pipe should be installed. What’s more, the discharge valve, butterfly valve and the pressure relief ball valve should be closed, the secondary air pipe should be opened, and the compressed air also should be connected to ensure that the air compressor is under no load Case.

Comment

testimonials-Avatar

G********h from India

I want to know the discharging procedure of the bulker trailer.

Administrator: Please refer to the unloading, loading and operation process of Cement trailer.? How to unload and load dry bulk cement tanker trailer (Video); How does a pneumatic dry bulk trailer work?

Leave a Reply

Your email address will not be published. Required fields are marked *